Relationship between Factors of Shield Tunneling Organization  and Tunneling Efficiency: Case Study on No. 06 Bid  Section of Line 1 of Shijiazhuang Metro

  • LI Junqing ,
  • YANG Sanlong
Expand
  • (The Third Engineering Co., Ltd. of China Railway Seventh Group, Xi’an 710032, Shaanxi, China)

Received date: 2015-04-21

  Revised date: 2015-07-08

  Online published: 2015-08-17

Abstract

In the paper, the relationship between the factors of the shield tunneling organization and the tunneling efficiency is analyzed, with No. 06 bid section of Line 1 of Shijiazhuang Metro as an example. In the end, the shield is launched 3 months ahead of the original schedule and the input for the shield tunneling is reduced.

Cite this article

LI Junqing , YANG Sanlong . Relationship between Factors of Shield Tunneling Organization  and Tunneling Efficiency: Case Study on No. 06 Bid  Section of Line 1 of Shijiazhuang Metro[J]. Tunnel Construction, 2015 , 35(S1) : 11 -14 . DOI: 10.3973/j.issn.1672-741X.2015.S1.003

Outlines

/

〈 〉