ISSN 2096-4498

   CN 44-1745/U

二维码

Numerical Study on Waterproof Failure Mechanism of Elastic Sealing Gasket of Underwater Shieldbored Tunnel

  • WANG Zhan
Expand
  • (CCCC Fourth Harbor Engineering Institute Co., Ltd., Guangzhou 510288, Guangdong, China)

Received date: 2015-08-13

  Revised date: 2015-11-06

  Online published: 2015-11-25

Abstract

In the paper, numerical simulation study is made on the waterproof failure mechanism of elastic sealing gaskets by means of ABAQUS program, with the design of the waterproof system of an underwater shieldbored tunnel as example. The finite element model used in the paper is compared with the previous simplified model, and the waterproof failure mechanism of elastic sealing gaskets in the case of joint opening and that in the case of joint staggering are analyzed respectively. Conclusions drawn are as follows: 1) In the case of joint opening, the water leakage mainly occurs at the contact surface between the sealing gaskets; 2) In the case of joint staggering, the water leakage at the contact surface between the sealing gaskets turns into water leakage at the contact surface between the sealing gasket and the concrete segment as the staggering displacement grows. 

Cite this article

WANG Zhan . Numerical Study on Waterproof Failure Mechanism of Elastic Sealing Gasket of Underwater Shieldbored Tunnel[J]. Tunnel Construction, 2015 , 35(11) : 1164 -1168 . DOI: 10.3973/j.issn.1672-741X.2015.11.008

Outlines

/

〈 〉