ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Application of Track Transportation in Construction of Small Crosssection Extremelylong Tunnel Constructed by Drilling and Blasting Method: Case Study on AngrenPap Railway Tunnel
Received date: 2015-03-11
Revised date: 2015-05-16
Online published: 2015-12-24
There are great difficulties in construction of small crosssection extremelylong tunnels. In this paper, the track transportation technology used in AngrenPap railway tunnel is presented in details in terms of equipment selection, site arrangement in and out of the tunnel, rail path arrangement and resource arrangement. It is conclude that track transportation has many advantages.
XIONG Wen’an . Application of Track Transportation in Construction of Small Crosssection Extremelylong Tunnel Constructed by Drilling and Blasting Method: Case Study on AngrenPap Railway Tunnel[J]. Tunnel Construction, 2015 , 35(S2) : 97 -100 . DOI: 10.3973/j.issn.1672-741X.2015.S2.017
/
| 〈 |
|
〉 |