ISSN 2096-4498

   CN 44-1745/U

二维码

Assessment Method for Service Performance of Shieldbored Tunnel Structure

  • YAO Xupeng ,
  • LI Qing ,
  • YUAN Yong
Expand
  • (1. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China;2. Shanghai Road Administration Bureau, Shanghai 200023, China)

Received date: 2015-08-07

  Revised date: 2015-11-17

  Online published: 2015-12-24

Abstract

It is of great necessity to establish a scientific method to assess the service performance of the tunnel structure, so as to deal with the deterioration and maintenance requirements of the tunnel structure. The first shieldbored tunnel in China was built in Shanghai, and so far a large number of shieldbored tunnels have been built in Shanghai. In the paper, the performance deterioration factors of the shieldbored tunnel structure and their relationship with the tunnel service history is analyzed and induced, the structural level of the shieldbored tunnel is classified, the contents and the procedure of the examination of the shieldbored tunnel structure are determined, the assessment method for the performance of the shieldboredtunnel structure is determined, thus a system is formed for the assessment of the service performance of shieldbored tunnels. 

Cite this article

YAO Xupeng , LI Qing , YUAN Yong . Assessment Method for Service Performance of Shieldbored Tunnel Structure[J]. Tunnel Construction, 2015 , 35(S2) : 215 -219 . DOI: 10.3973/j.issn.1672-741X.2015.S2.039

Outlines

/

〈 〉