Settlement Analysis on and Countermeasures for Shallowcovered Largespan Loess Tunnel Constructed by Mining Method Crossing Underneath Baggagededicated Gallery of Airport
Received date: 2015-07-19
Revised date: 2015-09-24
Online published: 2016-02-01
The settlement, deformation and concrete structure crack, may occur to the gallery due to the high construction risk and irrational construction of the shallowcovered largespan loess tunnel. In this paper, in order to satisfy the requirements of the baggagededicated gallery and to control the settlement, 3D numerical simulation method is used to analyze the settlement caused by new tunnel crossing underneath baggagededicated gallery of the airport. In addition, some effective measures, such as strengthening the monitoring and using effective technologies (including excavation step by step, advance support by means of largediameter pipe roof and grout backfilling behind primary support and secondary lining) have been adopted to minimize the settlement of the baggagededicated gallery. The settlement of the gallery floor is limited to about 3 mm, which guarantees the safety of the baggagededicated gallery.
TANG Xinquan . Settlement Analysis on and Countermeasures for Shallowcovered Largespan Loess Tunnel Constructed by Mining Method Crossing Underneath Baggagededicated Gallery of Airport[J]. Tunnel Construction, 2016 , 36(1) : 80 -85 . DOI: 10.3973/j.issn.1672-741X.2016.01.012
/
| 〈 |
|
〉 |