Key Construction Technologies for 6Track Tunnels in Shijiazhuang on BeijingGuangzhou Highspeed Railway
Received date: 2015-05-08
Revised date: 2016-01-05
Online published: 2016-03-02
The urban 6track tunnels (local 7track) in Shijiazhuang are different from other tunnels; their scale and complexity are unique in China. During the design and construction of the mentioned tunnels, a series of works, i.e. study demonstration, theoretical calculation, numerical analysis, construction scheme comparison and contrast, field testing and technical breakthrough, have been done so as to guarantee the safe construction of the tunnels. In the end, the safe construction of longdistance multiple arch tunnel is guaranteed; and a series of construction technologies, such as retaining of large foundation pit in soft strata, protection of beltshaped foundation pit adjacent to existing railway line, protection of multiple archtunnel crossing underneath running railway and construction of multiple archtunnel crossing underneath arterial road, and key research results of passengerdedicated railway crossing urban area are obtained.
WAN Qing , LI Huaijian , DU Hualin , MA Zhifu , ZHANG Guiyang , YU Quansheng , LIU Yong , WANG Zhong . Key Construction Technologies for 6Track Tunnels in Shijiazhuang on BeijingGuangzhou Highspeed Railway[J]. Tunnel Construction, 2016 , 36(2) : 241 -250 . DOI: 10.3973/j.issn.1672-741X.2016.02.018
/
| 〈 |
|
〉 |