Study on Risk Management and Control Technologies for Downtop  Excavation of Ancillary Works of Metro Station

  • XU Ling ,
  • LUO Furong
Expand
  • (Beijing MRT Construction Administration Corporation, Beijing 100068, China)

Received date: 2015-12-21

  Revised date: 2016-03-03

  Online published: 2016-03-30

Abstract

The downtop excavation method, with large construction risk, could be chosen when the construction scheme is short. The design, construction and management have to be controlled so as to guarantee the safe construction and to reduce the construction risk. In this paper, the comparison is made among the construction methods of ancillary works of mined Metro station on Line No.7 of Beijing Metro in terms of advantages and disadvantages; and then the construction technology and management technology of downtop excavation method are systematically studied. Finally, the construction scheme of downtop excavation method and the rules of ground surface settlement are analyzed. The monitoring data show that the safe construction has been guaranteed; the influence of downtop excavation on surrounding environment has been minimized and the ground surface settlement has been brought under effective control.

Cite this article

XU Ling , LUO Furong . Study on Risk Management and Control Technologies for Downtop  Excavation of Ancillary Works of Metro Station[J]. Tunnel Construction, 2016 , 36(3) : 320 -325 . DOI: 10.3973/j.issn.1672-741X.2016.03.012

Outlines

/

〈 〉