Jam Releasing Technologies for Opentype TBM Bored in Fault and Fracture Zones
Received date: 2015-09-06
Revised date: 2016-01-28
Online published: 2016-03-30
The tunnel boring machine(TBM) is jammed when boring in fault and fracture zones of a waterdiversion project. In order to release the TBM safely and rapidly, a series of technologies, i.e. strengthening the support of constructed sections, reinforcing the area ahead the tunneling face and the upper shield of TBM, reinforcing the surrounding rocks ahead the cutterhead by means of chemical grouting method, advance supporting and reinforcing the upper shield by means of pipe roof method and clearing the muck on the cutterhead, are adopted. Finally, the TMB is successfully released after 205 days.
DONG Silong . Jam Releasing Technologies for Opentype TBM Bored in Fault and Fracture Zones[J]. Tunnel Construction, 2016 , 36(3) : 326 -330 . DOI: 10.3973/j.issn.1672-741X.2016.03.013
/
| 〈 |
|
〉 |