Optimization Analysis of Calculation of Temporary Ring Beam for Shield Hoisting Shaft of Metro Station
Received date: 2015-11-09
Revised date: 2016-02-19
Online published: 2016-05-25
During the shield hoisting, the lateral pressure is mainly borne by the temporary ring beam; meanwhile, the stresses of surrounding soil are complicated. A threedimensional model of temporary ring beam is built and calculated. The calculation results are compared with conventional twodimensional model. Some conclusions are drawn as follows: 1) Twodimensional calculation has some disadvantages, such as too large bending moment and overconservative reinforcement, etc. 2) Compared with twodimensional calculation, threedimensional modeling calculation results are more rational. The study results can provide references for similar projects in the future.
GAO Tao , ZHAO Rui . Optimization Analysis of Calculation of Temporary Ring Beam for Shield Hoisting Shaft of Metro Station[J]. Tunnel Construction, 2016 , 36(5) : 544 -548 . DOI: 10.3973/j.issn.1672-741X.2016.05.008
/
| 〈 |
|
〉 |