Optimization Analysis of Calculation of Temporary Ring  Beam for Shield Hoisting Shaft of Metro Station

  • GAO Tao ,
  • ZHAO Rui
Expand
  • (1. Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003, Henan, China;  2. Shangqiu Water Conservancy Construction Survey Design Institute, Shangqiu 476000, Henan, China)

Received date: 2015-11-09

  Revised date: 2016-02-19

  Online published: 2016-05-25

Abstract

During the shield hoisting, the lateral pressure is mainly borne by the temporary ring beam; meanwhile, the stresses of surrounding soil are complicated. A threedimensional model of temporary ring beam is built and calculated. The calculation results are compared with conventional twodimensional model. Some conclusions are drawn as follows: 1) Twodimensional calculation has some disadvantages, such as too large bending moment and overconservative reinforcement, etc. 2) Compared with twodimensional calculation, threedimensional modeling calculation results are more rational. The study results can provide references for similar projects in the future.

Cite this article

GAO Tao , ZHAO Rui . Optimization Analysis of Calculation of Temporary Ring  Beam for Shield Hoisting Shaft of Metro Station[J]. Tunnel Construction, 2016 , 36(5) : 544 -548 . DOI: 10.3973/j.issn.1672-741X.2016.05.008

Outlines

/

〈 〉