ISSN 2096-4498

   CN 44-1745/U

二维码

Optimal Layout of Monitoring Points for Tunnel Crown Settlement by Using Triangle Area Method

  • YANG Hao
Expand
  • (Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003, Henan, China)

Received date: 2015-12-18

  Revised date: 2016-02-19

  Online published: 2016-07-27

Abstract

The triangle area method for tunnel crown settlement monitoring by using convergence gauge is an economical and highprecision deformation monitoring method. The mathematical analysis is made on the triangle area method; and an optimal triangle layout of monitoring points is decided by calculating peak value of medium error function of settlement. The results show that the underside length of the triangle, equaling 1.362 5 times waist length, is the best choice which can achieve optimal monitoring precision.

Cite this article

YANG Hao . Optimal Layout of Monitoring Points for Tunnel Crown Settlement by Using Triangle Area Method[J]. Tunnel Construction, 2016 , 36(7) : 868 -871 . DOI: 10.3973/j.issn.1672-741X.2016.07.016

Outlines

/

〈 〉