ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Tunneling by Mining Method: Lecture X: Construction Technologies for Early Close of Excavation Crosssection of Tunnel in Soft and Weak Surrounding Rocks
Received date: 2015-08-10
Online published: 2016-08-17
The concept of early close of excavation crosssection is introduced. It is pointed out that: 1) The early close of excavation crosssection has to be adopted in bad surrounding rocks. 2) The close time and distance of excavation crosssection reduce with the surrounding rock goes worse. 3) The close distance of excavation crosssection increases with partition of excavation crosssection increases. 4) The early close of excavation crosssection indicates the close of primary support. The classification of setting of early closed inverted arch of tunnels in Japan is introduced. The author believes that we have to learn how to improve the construction technologies so as to realize early close of excavation crosssection. The standards for early close of excavation crosssection in Japan have been perfected. The mode of the standards and concept of early close in Japan are introduced. The tunnels in Japan, adopting early close of excavation crosssection,are introduced. The early close modes of excavation crosssection are divided into 5 kinds. The rationality of adopting early close of excavation crosssection is summarized. The surrounding rock conditions in which early close of excavation crosssection has to be adopted are summarized. The structural parameters and construction technologies of tunnel using early close of excavation crosssection are introduced. The construction management methods of early close of excavation crosssection of Qiwei Tunnel in Japan, including management items, final displacement management standards, primary displacement speed management standards, early close modes and related modification, are introduced in detail. The construction technologies for largecrosssection tunnel in soft and weak surrounding rocks are summarized. The combination method of reinforcement of surrounding rock ahead of excavation face and early close of excavation crosssection, together with advance geological prediction hole drilling (under condition of water), are the basic methods for construction of bad surrounding rocks.
GUAN Baoshu . Tunneling by Mining Method: Lecture X: Construction Technologies for Early Close of Excavation Crosssection of Tunnel in Soft and Weak Surrounding Rocks[J]. Tunnel Construction, 2016 , 36(8) : 887 -896 . DOI: 10.3973/j.issn.1672-741X.2016.08.001
/
| 〈 |
|
〉 |