Design and Application of A New Steel Pipe Column Hoisting Trolley to PBA Mined Stations
Received date: 2016-06-15
Revised date: 2016-07-20
Online published: 2016-11-01
Due to the height limit in tunnel of PBA mined Metro station, the steel pipe column hoisting trolley can not be used. The preembedded steel pipe column and welding hoisting method are prohibited so as to guarantee the safety of primary support. The application of a new steel pipe column hoisting trolley to Yuyuantan East Station shows that the abovementioned trolley is easy and highefficient, and can guarantee the safety of primary support.
ZHANG Qing . Design and Application of A New Steel Pipe Column Hoisting Trolley to PBA Mined Stations[J]. Tunnel Construction, 2016 , 36(10) : 1277 -1282 . DOI: 10.3973/j.issn.1672-741X.2016.10.018
/
| 〈 |
|
〉 |