Construction Technologies for Large Crosssection Tunnel Using Mining Method to Enlarge Shield Tunnel

  • CHEN Ruizheng ,
  • HU Weidong ,
  • LI Xinping
Expand
  • (China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, Hubei, China)

Received date: 2016-05-09

  Revised date: 2016-07-27

  Online published: 2016-11-30

Abstract

The connection section between left line of Line No. 2 of Zhengzhou Metro and connecting tunnel of Line No. 1 and Line No. 2 are constructed together. The surrounding environment is complicated and the construction schedule is tight. The large crosssection tunnel construction technology, mining method, is adopted to enlarge the shield tunnel. The section is bored by shield, and then the steel segments, the bench method of central pillar + temporary invert and inverse enlarging method are adopted. The construction practice shows that the ground settlement and the construction schedule have been controlled effectively. The abovementioned technologies can provide reference for similar projects in the future.

Cite this article

CHEN Ruizheng , HU Weidong , LI Xinping . Construction Technologies for Large Crosssection Tunnel Using Mining Method to Enlarge Shield Tunnel[J]. Tunnel Construction, 2016 , 36(11) : 1372 -1378 . DOI: 10.3973/j.issn.1672-741X.2016.11.014

Outlines

/

〈 〉