ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Prediction of Disc Cutter Wear and Replacement of Shield used inSeacrossing Section of Xiamen Rail Transit Line No. 2
Received date: 2016-04-26
Revised date: 2016-06-28
Online published: 2016-11-30
It is very important to reduce the construction risk of shield disc cutter replacement. The shield disc cutter replacing places of seacrossing section of Xiamen Rail Transit Line No. 2 are predicted based on theoretical prediction model and testing prediction model under different kinds of rocks. The shield disc cutter replacing places and technologies are proposed by analyzing the feasibility of cutter replacing technologies. 1) The cutting cutter is used in silt soil; 〖JP2〗the cutter is replaced close to connecting gallery No.1 under atmospheric pressure. 2) The disc cutter is used in fullyweathered soil with low pressure; the cutters should be replaced by 4 times under hyperbaric pressure (1 times at intermediate ventilation shaft No. 1 and 3 times under sea). 3) The disc cutter is used in fullyweathered soil with high pressure; the cutters should be replaced by 4 times under saturated air hyperbaric pressure. 4) The disc cutter is used in moderatelyslightly weathered soil; the cutters should be replaced by 3 times by using pressure reduction method.
XU Liming , YANG Yandong , ZHOU Jianjun , CHEN Kui , CAI Guangyuan . Prediction of Disc Cutter Wear and Replacement of Shield used inSeacrossing Section of Xiamen Rail Transit Line No. 2[J]. Tunnel Construction, 2016 , 36(11) : 1379 -1384 . DOI: 10.3973/j.issn.1672-741X.2016.11.015
/
| 〈 |
|
〉 |