ISSN 2096-4498

   CN 44-1745/U

二维码

Study of Deformation Characteristics of Large Crosssection Tunnel in Xigeda Fm Strata

  • WANG Zhijie ,
  • XU Ruining ,
  • HE Nengfang
Expand
  • (1. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031, Sichuan, China; 2. Hebei Provincial Communications Planning and Design Institute, Shijiazhuang 050011, Hebei, China; 3. CCCC Tunnel Fourth Engineering Company Limited, Chengdu 610041, Sichuan, China)

Received date: 2016-04-18

  Revised date: 2016-08-22

  Online published: 2016-12-30

Abstract

The deformation characteristics of large crosssection Tongzilin Tunnel on MiyiPanzhihua Section on ChengduKunming Railway located in Xigeda Fm strata and constructed by three bench+temporary invert arch method are studied by numerical simulation and site monitoring, so as to guarantee the stability of surrounding rocks during construction. The study results show that: 1) The deformations of surrounding rocks of large crosssection tunnel in Xigeda Fm strata are mainly along vertical direction. 2) The primary crown top settlement and crown top settlement induced by top heading excavation takes 41.3% in total settlement; and the advanced influencing range is 1.3D. 3) The crown top settlement and arch feet convergence are mainly affected by middle bench excavation. 4) The prediction formula for crown top settlement vs. time is U=102.105·exp(-5.33/X). 5) The prediction formula for horizontal convergence of arch feet vs. time is L1=19.552·exp(-7.49/X). 6) The prediction formula for horizontal convergence of tunnel wall waist vs. time is L2=17.862·exp(-23.26/X).

Cite this article

WANG Zhijie , XU Ruining , HE Nengfang . Study of Deformation Characteristics of Large Crosssection Tunnel in Xigeda Fm Strata[J]. Tunnel Construction, 2016 , 36(12) : 1412 -1420 . DOI: 10.3973/j.issn.1672-741X.2016.12.002