ISSN 2096-4498

   CN 44-1745/U

二维码

Steel Sleeve Receiving Technology for EPB Shield Boring in Waterrich Sandycobble Strata

  • XIAO Heng ,
  • HU Rong ,
  • LIANG Xinquan ,
  • JIANG Lingxiang ,
  • YANG Shipeng
Expand
  • (1. Changsha Metro Group Co., Ltd., Changsha 410075, Hunan, China; 2. Hunan No.6 Engineering Co., Ltd., Changsha 410015, Hunan, China; 3. China Railway 16th Bureau Group Co., Ltd., Beijing 100018, China)

Received date: 2016-04-07

  Revised date: 2016-05-24

  Online published: 2017-01-24

Abstract

The receiving of earth pressure balance (EPB) shield is the key to shield tunneling with high risk. It is very important to study the shield receiving without consolidation of receiving end in waterrich sandycobble strata. The shield receiving technologies, fiberglass steel underground diaphragm + steel sleeve, for EPB shield boring in waterrich sandycobble strata of Huangxing Square Station on Changsha Metro Line No. 1 without receiving end consolidation are analyzed. The results can proviole reference for similar projects in the future.

Cite this article

XIAO Heng , HU Rong , LIANG Xinquan , JIANG Lingxiang , YANG Shipeng . Steel Sleeve Receiving Technology for EPB Shield Boring in Waterrich Sandycobble Strata[J]. Tunnel Construction, 2017 , 37(1) : 93 -96 . DOI: 10.3973/j.issn.1672-741X.2017.01.015

Outlines

/

〈 〉