ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Construction Technologies for Open TBM Used in Karst Areas and Softweak and Broken Grounds: Case Study of Songhua River Water Diversion Project
Received date: 2016-08-04
Revised date: 2016-11-11
Online published: 2017-03-04
The tunnel of No. 4 Bid Section of Songhua River Water Diversion Project bored by TBM is about 17 km; and there are total 7 332 m crosses softweak and broken areas; i.e. limestone (karst), carbonaceous slate and fracture. The TBM often deviates, pitches and jammed when boring in the abovementioned areas. In this paper, the TBM construction cases, related expert consultations and construction schemes are analyzed and studied; and then a series of countermeasures for TBM continuous construction, i.e. advanced geological prediction and support scheme of steel arch frame + rebar row + shotcreting, are proposed. The practice shows that the abovementioned technologies are feasible and rational and can guarantee the TBM continuous construction in karst areas and softweak and broken grounds.
SUN Zhenchuan , CHEN Jianli . Construction Technologies for Open TBM Used in Karst Areas and Softweak and Broken Grounds: Case Study of Songhua River Water Diversion Project[J]. Tunnel Construction, 2017 , 37(2) : 215 -222 . DOI: 10.3973/j.issn.1672-741X.2017.02.014
/
| 〈 |
|
〉 |