Construction Technologies for Open TBM Used in Karst Areas and Softweak and Broken Grounds: Case Study of Songhua River Water Diversion Project

  • SUN Zhenchuan ,
  • CHEN Jianli
Expand
  • (1. China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China;2. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China)

Received date: 2016-08-04

  Revised date: 2016-11-11

  Online published: 2017-03-04

Abstract

The tunnel of No. 4 Bid Section of Songhua River Water Diversion Project bored by TBM is about 17 km; and there are total 7 332 m crosses softweak and broken areas; i.e. limestone (karst), carbonaceous slate and fracture. The TBM often deviates, pitches and jammed when boring in the abovementioned areas. In this paper, the TBM construction cases, related expert consultations and construction schemes are analyzed and studied; and then a series of countermeasures for TBM continuous construction, i.e. advanced geological prediction and support scheme of steel arch frame + rebar row + shotcreting, are proposed. The practice shows that the abovementioned technologies are feasible and rational and can guarantee the TBM continuous construction in karst areas and softweak and broken grounds.

Cite this article

SUN Zhenchuan , CHEN Jianli . Construction Technologies for Open TBM Used in Karst Areas and Softweak and Broken Grounds: Case Study of Songhua River Water Diversion Project[J]. Tunnel Construction, 2017 , 37(2) : 215 -222 . DOI: 10.3973/j.issn.1672-741X.2017.02.014