ISSN 2096-4498

   CN 44-1745/U

二维码

Study of Optimization of Construction Ventilation of Wanhua Yantai Underground Liquefied Hydrocarbon Watersealed Cavern Group

  • CHEN Haifeng
Expand
  • (The First Construction Division Co., Ltd. of China Railway Tunnel Group, Chongqing 401123, China)

Received date: 2016-08-18

  Revised date: 2016-11-21

  Online published: 2017-03-04

Abstract

The large crosssection construction ventilation is very important in underground watersealed cavern group. As a result, the amount of vertical ventilation shafts is increased. In this paper, 3D numerical simulation method is adopted to analyze the distribution laws of CO and the influence of locations of fans in air chamber on fan efficiency. The results show that: 1) The concentration of CO near working face is less than 24×10-6 after 30 minutes of ventilation after blasting of working face, which can meet related requirements. 2) The fan efficiency of 2 line typed is higher than that of 1 line typed; and the fan efficiency with 2 m span among fan group is the highest.

Cite this article

CHEN Haifeng . Study of Optimization of Construction Ventilation of Wanhua Yantai Underground Liquefied Hydrocarbon Watersealed Cavern Group[J]. Tunnel Construction, 2017 , 37(2) : 230 -235 . DOI: 10.3973/j.issn.1672-741X.2017.02.016

Outlines

/

〈 〉