Application of HSP (Horizontal Sonic Profiling) Sound Wave Reflection Method to Geological Prediction of TBM Tunnel of Hanjiang RiverWeihe River Water Diversion Project
Received date: 2016-08-26
Revised date: 2016-10-24
Online published: 2017-03-04
During the construction of TBM, advanced geological prediction and TBM rapid construction often affects each other. As a result, the difficulties of geological prediction are analyzed; and then the working principle and method of HSP sound wave reflection method applied to TBM construction are introduced based on the characteristics of TBM construction. The vibration of rock induced by TBM cutterhead is regarded as vibration source signal; and then the array typed pole arrangement method is used to collect characteristics of the ground ahead. The comparison between analytical results and actual application of HSP sound wave reflection method applized to geological prediction of TBM tunnel of Hanjiang RiverWeihe River Water Diversion Project shows that the HSP sound wave reflection method is feasible and highlyefficient in geological prediction of bad geological conditions.
LU Song , LI Cangsong , WU Fengshou , ZHOU Yunjin . Application of HSP (Horizontal Sonic Profiling) Sound Wave Reflection Method to Geological Prediction of TBM Tunnel of Hanjiang RiverWeihe River Water Diversion Project[J]. Tunnel Construction, 2017 , 37(2) : 236 -241 . DOI: 10.3973/j.issn.1672-741X.2017.02.017
/
| 〈 |
|
〉 |