Case Study of Shield Jamming and Jamming Releasing Technologies

  • HUANG Pinghua
Expand
  • (1. China Railway Tunnel Stock Co., Ltd., Zhengzhou 450000, Henan, China; 2. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China)

Received date: 2016-04-11

  Revised date: 2016-06-21

  Online published: 2017-03-30

Abstract

Shield is often jammed during tunneling, which has adverse impact on construction schedule, security and environment. The causes of cutterhead jamming, shield body jamming and shield tail jamming are analyzed; and then corresponding releasing technologies are summarized by cases study. The classification characteristics of shield jamming are summarized as shield cutterhead covered by grout, insufficient excavation contour of tunnel face caused by marginal cutters wear and obstacles in front of cutterhead.

Cite this article

HUANG Pinghua . Case Study of Shield Jamming and Jamming Releasing Technologies[J]. Tunnel Construction, 2017 , 37(3) : 342 -347 . DOI: 10.3973/j.issn.1672-741X.2017.03.013

Outlines

/

〈 〉