Abstract

The open TBM bores through limestone section of 7 km long of Bid Section No. 4 of Songhua River Water Conveyance Project. The advanced geological prediction system and lining system of TBM are designed based on characteristics, i.e. long distance, large crosssection, rapid boring and strengthened support of the project. And then, corresponding construction technologies and countermeasures are decided for bad geological conditions. The TBM has successfully bored through the limestone section; the construction cost has been reduced and the construction schedule has been shortened by relevant design, construction technologies and countermeasures adopted. 

Cite this article

ZHAO Hailei , CHEN Kui , ZHOU Jianjun , ZHANG Bing , YANG Bin , WANG Zhenfei . Research on Construction Technologies for TBM Continuous Boring through Limestone Section of Bid Section No.4 of Songhua River Water Conveyance Project[J]. Tunnel Construction, 2017 , 37(3) : 354 -362 . DOI: 10.3973/j.issn.1672-741X.2017.03.015