ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Estimation of TBM Performance Parameters Based on Rock Mass Rating (RMR) System
Received date: 2016-09-12
Revised date: 2016-12-01
Online published: 2017-07-02
In order to solve low boring efficiency of TBM caused by geological conditions, the TBM boring performance parameters estimation based on rock mass rating (RMR) system is proposed in view of TBM data base of Songhua River Water Conveyance Project in Jilin Province. The empirical correlation formulas of RMR with TBM performance parameters, i.e. penetration rate (PR), advance rate (AR), utilization (U) and field penetration index (FPI) are respectively given by regression analysis. The study results show that: 1) The relationship between RMR and PR and that between AR and U can be approximated by seconddegree polynomial curves; RMR and FPI present linear relationship, and the correlation coefficients are all larger than 0.7. 2) Better performance of TBM can be reached in fair rock (RMR=50-70) whilst bad performance of TBM will be reached in bad rocks (RMR<30-40) or rock beyond good (RMR > 70-80). 3) The utilization of TBM used in Songhua River Water Conveyance Project in Jilin Province is 22.36%, and geology and rock mass related downtime takes about 25.97% in total construction schedule.
WANG Jian , WANG Ruirui , ZHANG Xinxin , LIU Haidong , PANG Yonghao . Estimation of TBM Performance Parameters Based on Rock Mass Rating (RMR) System[J]. Tunnel Construction, 2017 , 37(6) : 700 -707 . DOI: 10.3973/j.issn.1672-741X.2017.06.008
/
| 〈 |
|
〉 |