ISSN 2096-4498

   CN 44-1745/U

二维码

Technology for Longdistance Boring of Shield in Sandy Strata: A Case Study of Zhengzhou Metro

  • ZHANG Zhao
Expand
  • (Zhengzhou Metro Co., Ltd., Zhengzhou 450000, Henan, China)

Received date: 2017-03-20

  Revised date: 2017-06-04

  Online published: 2017-07-26

Abstract

The potential risks of longdistance boring of shield in sandy strata of Phase 2 of Zhengzhou Metro Line No. 2 are analyzed. The adaptability design of the shield machine is carried out in terms of wear resistance and cutterhead opening rate according to the mechanical parameters of sandy strata before shield boring. The rational ground conditioning methods and grouting parameters are decided by field test during shield tunneling. The results show that the wear resistance and the shield boring efficiency in sandy strata have been improved and the ground surface settlement has been controlled by adopting abovementioned technologies.

Cite this article

ZHANG Zhao . Technology for Longdistance Boring of Shield in Sandy Strata: A Case Study of Zhengzhou Metro[J]. Tunnel Construction, 2017 , 37(7) : 851 -856 . DOI: 10.3973/j.issn.1672-741X.2017.07.011

Outlines

/

〈 〉