ISSN 2096-4498

   CN 44-1745/U

二维码

Intuitionistic Fuzzy Optimization of Enlargement Scheme of Highway Tunnel in Mountain Areas Based on Hamming DistanceTOPSIS Method

  • WU Xiaoguang ,
  • HE Pan ,
  • SU Xingju ,
  • QIAN Ruolin
Expand
  • (1. Key Laboratory of Bridge and Tunnel of Shaanxi Province, Chang′an University, Xi′an 710064, Shaanxi, China; 2. Highway School of Chang′an University, Xi′an 710064, Shaanxi, China; 3. ZhangzhouLongyan Section Enlargement Engineering Co., Ltd. of XiamenChengdu Expressway in Fujian, Longyan 364000, Fujian, China)

Received date: 2017-03-13

  Revised date: 2017-06-20

  Online published: 2017-08-22

Abstract

The determination of rehabilitation scheme of highway tunnel in mountain areas is difficult; and there are few theoretical references. As a result, a determination method for multiple attribute problem with priority relation is put forward based on intuitionistic fuzzy based Hamming distance, TOPSIS method and expert weight vector correction. And then, the influencing factors of the rehabilitation of the highway tunnel in mountain areas are analyzed; and then the influence index system of the tunnel enlargement scheme is established. Finally, the indicators are prioritized by experts invited, and the enlargement scheme optimization is realized by mathematical model established. The successful application of the abovementioned method to enlargement construction of tunnel on XiamenChengdong Highway indicates that the method is rational and feasible, and can provide reference for tunnel rehabilitation of similar projects in the future.

Cite this article

WU Xiaoguang , HE Pan , SU Xingju , QIAN Ruolin . Intuitionistic Fuzzy Optimization of Enlargement Scheme of Highway Tunnel in Mountain Areas Based on Hamming DistanceTOPSIS Method[J]. Tunnel Construction, 2017 , 37(8) : 926 -932 . DOI: 10.3973/j.issn.1672-741X.2017.08.002

Outlines

/

〈 〉