ISSN 2096-4498

   CN 44-1745/U

二维码

Determination of Ultimate Relative Displacements of Primary Support of Mountaincrossing Highway Tunnel

  • XU Dongqiang ,
  • YAN Peng ,
  • LI Yanqi ,
  • WANG Keyi
Expand
  • (School of Civil Engineering and Transportation, Hebei University of Technology, Tianjin 300401, China)

Received date: 2017-01-09

  Revised date: 2017-03-28

  Online published: 2017-09-28

Abstract

In order to calculate the ultimate relative displacement of primary support of mountaincrossing highway tunnel, the HoekBrown criterion is adopted; the highway tunnel standards, crosssection pattern, supporting methods and material properties are taken as references; short bench excavation method is adopted; and the ultimate relative displacements of crown top, arch springer and arch feet of the threelane highway tunnel under different grades of surrounding rocks and buried depths are simulated and calculated by software FLAC3D and are further determined by catastrophe theory. According to the statistical analysis of calculation results, it is pointed out that the deformation control points of the tunnel surrounding can be defined clearly and the buried depth can be refined; by analyzing the influences of benches excavation on deformation of different points and comparing to field construction, the influence of the excavation step on the displacement of tunnel surrounding can be determined.

Cite this article

XU Dongqiang , YAN Peng , LI Yanqi , WANG Keyi . Determination of Ultimate Relative Displacements of Primary Support of Mountaincrossing Highway Tunnel[J]. Tunnel Construction, 2017 , 37(9) : 1083 -1089 . DOI: 10.3973/j.issn.1672-741X.2017.09.004

Outlines

/

〈 〉