Study of Construction Technology of Steel Tube Slab Structure for Mined Metro Station
Received date: 2017-08-15
Revised date: 2017-10-27
Online published: 2018-02-01
The traditional mining method can not meet the requirements of tunnel construction in complex geology and area with multiple risk sources. As a result, the steel tube slab (STS) pipe curtain method, a new construction method for ultrashallow buried metro stations is proposed. The drag reduction by grouting, soil cleaning between steel tubes, bolt connection, concrete pouring and ground surface settlement during pipe jacking of a metro station in Shenyang constructed by STS pipe curtain method are studied by field test and monitoring. And then a series of problems have been solved; a series of technologies have been developed; therefore the successful construction of mined metro station by STS pipe curtain method has been guaranteed.
ZHAO Wen , DONG Jiachao , JIA Pengjiao , SHI Jianjun , XIAO Junhang , LIU Qiang . Study of Construction Technology of Steel Tube Slab Structure for Mined Metro Station[J]. Tunnel Construction, 2018 , 38(1) : 72 -79 . DOI: 10.3973/j.issn.2096-4498.2018.01.009
/
| 〈 |
|
〉 |