ISSN 2096-4498

   CN 44-1745/U

二维码

Construction Methods for Ultra Largespan Fourtrack Deep Tunnel on Wumengshan No. 2 Exit Section

  • QING Weichen ,
  • GAO Yang ,
  • ZHU Yong ,
  • ZHANG Huijian
Expand
  • (1. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, Sichuan, China;  2. Southwest Jiaotong University, Chengdu 610031, Sichuan, China)

Received date: 2017-07-17

  Revised date: 2017-10-31

  Online published: 2018-02-01

Abstract

The construction of ultra largespan fourtrack tunnel, of which the excavation area equals to 6 times of that of traditional singletrack railway tunnel, is difficult; and there is no successful precedent. The construction methods for ultra largespan fourtrack deep tunnel on Wumengshan No. 2 exit section on LiupanshuiZhanyi Railway are studied by numerical simulation and site monitoring methods. The results show that: 1) By using temporary support replaced by prestressed anchor, the temporary support of arch is successfully dismantled, the replacing construction risk of arch is reduced; the disadvantages of traditional soft rock tunnel construction are overcome; the safety and flexibility of support dismantling are improved; and large working face can be provided for followed construction step. 2) By using temporary crossbrace replaced by prestressed anchor cable, the temporary crossbrace dismantling risk is avoided; and the construction flexibility is improved. 3) The threebench excavation of ultra largespan tunnel is realized by using temporary support replaced by prestressed anchor and temporary crossbrace replaced by prestressed anchor cable.

Cite this article

QING Weichen , GAO Yang , ZHU Yong , ZHANG Huijian . Construction Methods for Ultra Largespan Fourtrack Deep Tunnel on Wumengshan No. 2 Exit Section[J]. Tunnel Construction, 2018 , 38(1) : 91 -102 . DOI: 10.3973/j.issn.2096-4498.2018.01.012

Outlines

/

〈 〉