Adaptive Design and Application of Doubleshield TBM to Qingdao Metro Tunnel
Received date: 2017-08-01
Revised date: 2017-10-17
Online published: 2018-02-01
The adaptive design of doubleshield TBM in Qingdao Metro Line No.2 is carried out to fit the special construction condition of urban metro tunnel with rock geology. The module design is used; the auxiliary gripper is equipped on front shield matching with stabilizer; the segment is transported to segment erector by crane; the shuttle conveyor is used for mucking of backup system; and the laser guiding system with double laser targets is adopted for smallradius boring. By adopting the abovementioned technologies, the TBM assembling, launching, boring, mucking, station passing through, smallradius boring and TBM disassembling in tunnel have been successfully finished; therefore good application effect has been achieved. The feasibility of the doubleshield TBM used in Qingdao metro tunnel has been verified by analyzing boring parameters of TBM, deformation of lining and settlement of ground surface.
GUO Zhi , WANG Xiaoqiang , WANG Yidong , LIU Lihuan , QU Qiufen . Adaptive Design and Application of Doubleshield TBM to Qingdao Metro Tunnel[J]. Tunnel Construction, 2018 , 38(1) : 135 -141 . DOI: 10.3973/j.issn.2096-4498.2018.01.018
/
| 〈 |
|
〉 |