ISSN 2096-4498

   CN 44-1745/U

二维码

Study of Rapid Construction Organization of Singleline Superlong Railway Tunnel

  • XIE Wenqing ,
  • CHEN Yao
Expand
  • (China Railway Second Bureau Engineering Co., Ltd., Chengdu 610091, Sichuan, China)

Received date: 2017-07-13

  Revised date: 2018-01-16

  Online published: 2018-02-25

Abstract

As a singlehole singleline tunnel of heavy haul railway, the Lianyunshan Tunnel on Menghua Railway is characterized by long deadend heading distance and small crosssection. With the interference of transportation during construction, it is sophisticated to achieve rapid construction. In order to realize rapid construction organization of singleline smallsection tunnel, the construction organization of tunnel excavation, inverted arch and secondary lining, construction machinery and equipment matching and excavation measures are studied, and based on which, the rapid construction of singleline superlong tunnel has been successfully realized. The results can provide reference for similar projects in the future.

Cite this article

XIE Wenqing , CHEN Yao . Study of Rapid Construction Organization of Singleline Superlong Railway Tunnel[J]. Tunnel Construction, 2017 , 37(S2) : 198 -204 . DOI: 10.3973/j.issn.2096-4498.2017.S2.030

Outlines

/

〈 〉