Evaluation Method for Radiation Dose of Workers during  Mountaincrossing Tunnel Construction and Its Application

  • XU Hua ,
  • TANG Yinfei ,
  • ZHANG Peng ,
  • LI Wangbin ,
  • CHEN Ziyun
Expand
  • (1. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, Sichuan, China;  2. Ganzi City Traffic Construction Investment Co., Ltd., Kangding 626000, Sichuan, China;  3. Sichuan Communication Surveying & Design Institute, Chengdu 610017, Sichuan, China)

Received date: 2017-12-04

  Revised date: 2018-03-24

  Online published: 2018-06-01

Abstract

In order to evaluate the radiation and its impacts on workers during mountaincrossing tunnel construction, a suit of evaluation methods applicable to the tunnel construction with New Austrian Tunneling Method (NATM) is recommended. The average individual radiation dose of tunnel workers per year is chosen as evaluating indicator, and the environmental factors including air radon concentration, environmental gamma radiation dose rate, dust concentration and radionuclides specific activity are tested. The abovementioned assessment method is applied to the radiation environment of Mogangling Tunnel under different working processes. The assessment results show that the average individual radiation dose of workers in Mogangling Tunnel construction per year ranges from 0.203 to 1.13 mSv; therefore, the impact of radiation environment on workers is relatively low. The assessment method in this study considers different irradiation time of tunnel workers in different processes as well as multifarious radiation sources, and the selection of radiation indicators meets the actual situation at the same time. The study results can provide guidance for construction safety and radiation control in tunnel construction at abnormal radiation area.

Cite this article

XU Hua , TANG Yinfei , ZHANG Peng , LI Wangbin , CHEN Ziyun . Evaluation Method for Radiation Dose of Workers during  Mountaincrossing Tunnel Construction and Its Application[J]. Tunnel Construction, 2018 , 38(5) : 776 -781 . DOI: 10.3973/j.issn.2096-4498.2018.05.009

Outlines

/

〈 〉