ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Construction Control Technology for Large Deformation Section of Basalt Tunnel on LijiangShangriLa Railway
Received date: 2017-12-01
Revised date: 2018-03-07
Online published: 2018-06-19
During the construction of LijiangShangriLa Railway, large deformation of Triassic basalt is very serious. Hence, the deformation mechanism and causes are analyzed; and the supporting measures are determined. And then field test is carried out. Finally, tests are carried out on insitu strength, loose zone, mineral compositions, ground stress, deformation characteristics and internal forces of primary support and secondary lining of large deformation section. It is concluded that the following measures can effectively control the large deformation of basalt: (1) Increasing the curvature of sidewall and amount of reserved deformation. (2) Increasing the primary support steel frame model and lengthening the sidewall system bolt. (3) Shortening the closing time of primary support steel frame. (4) Controlling the primary support deformation velocity within 12mm/d when carrying out secondary lining.
LI Guimin . Construction Control Technology for Large Deformation Section of Basalt Tunnel on LijiangShangriLa Railway[J]. Tunnel Construction, 2018 , 38(S1) : 167 -174 . DOI: 10.3973/j.issn.2096-4498.2018.S1.026
/
| 〈 |
|
〉 |