ISSN 2096-4498

   CN 44-1745/U

二维码

A GIS/BIMIntegrated Lifecycle Management System for Shield Tunnel

  • LIN Xiaodong ,
  • LI Xiaojun ,
  • LIN Hao
Expand
  • (1. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China; 2. Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092, China)

Received date: 2017-10-30

  Revised date: 2018-01-21

  Online published: 2018-07-04

Abstract

In order to solve the problem of the lack of data standard in geographic information system (GIS) and the analysis function in building information model (BIM), a GIS/BIM integrated lifecycle management system for shield tunnel is built based on the analysis of the data management in GIS and data standards in BIM. Firstly, the technical route of the system is summarized. And then the shield tunnel information model is extended based on the IFC standard, including the information of geology, structure, alignment, construction, monitoring and disease; and an introduction to the information association is presented, including code format of shield tunnel and the integration of GIS and BIM. Finally, the application of lifecycle management of the system is described relied on the Shanghai metro shield tunnel, including geological survey, structural design, operation monitoring and maintenance. The system designs a unified information model to facilitate the data exchange and management efficiency. The functions of the information model visualization and analysis is also developed to improve the digital lifecycle management of shield tunnel.

Cite this article

LIN Xiaodong , LI Xiaojun , LIN Hao . A GIS/BIMIntegrated Lifecycle Management System for Shield Tunnel[J]. Tunnel Construction, 2018 , 38(6) : 963 -970 . DOI: 10.3973/j.issn.2096-4498.2018.06.011

Outlines

/

〈 〉