ISSN 2096-4498

   CN 44-1745/U

二维码

Study of Measurement and Distribution Characteristics of Surrounding Rock Stress of Large Crosssectional Highspeed Railway Tunnel with Mechanized Construction

  • YU Li ,
  • WANG Zhilong ,
  • YANG Nie
Expand
  • (1. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Sichuan 610031, Chengdu, China; 2. School of Civil Engineering, Southwest Jiaotong University, Sichuan 610031, Chengdu, China)

Received date: 2018-04-16

  Revised date: 2018-07-08

  Online published: 2018-09-04

Abstract

A large amount of field measurement on surrounding rock stress of tunnel group on Hubei Section of ZhengzhouWanzhou Highspeed Railway with mechanized construction are carried out to learn the variation laws and distribution characteristics of surrounding rock stress of large crosssectional highspeed railway tunnel with mechanized construction. And then the surrounding rock stress variation laws and distribution characteristics of surrounding rock stress in Grade Ⅳ and Grade Ⅴ deepburied conditions are analyzed and compared with standard loads based on measurement results. The study results show that: (1)The stabilizing time of surrounding rock stress starts on the 21st to the 27th day. (2)The measured surrounding rock stress is less than the calculated load of deepburied tunnel in related railway design codes. (3)Under the condition of Grade Ⅳ depth, the lateral pressure coefficient is 1.2-2.4 times that of standard load. (4)Under the condition of Grade Ⅴ depth, the lateral pressure coefficient is 0.86-1.43 times that of standard load.

Cite this article

YU Li , WANG Zhilong , YANG Nie . Study of Measurement and Distribution Characteristics of Surrounding Rock Stress of Large Crosssectional Highspeed Railway Tunnel with Mechanized Construction[J]. Tunnel Construction, 2018 , 38(8) : 1303 -1310 . DOI: 10.3973/j.issn.2096-4498.2018.08.006

Outlines

/

〈 〉