Numerical Simulation and Site Monitoring Analysis of Influence of Division Excavation of Foundation Pit on Adjacent Largediameter Rivercrossing Tunnel
Received date: 2017-12-05
Revised date: 2018-04-13
Online published: 2018-09-30
The protection effect of the division excavation of foundation pit on adjacent rivercrossing tunnel is studied by taking the foundation pit of Lyugu Phase 1 Project adjacent to doubletrack rivercrossing tunnel on South Tibet Road in Shanghai for example. Firstly, the influence of division excavation and nondivision excavation of foundation pit on displacement of underground diaphragm wall and convergence deformation of the existing rivercrossing tunnel is studied by finite element method. And then, the deformation rules of the existing rivercrossing tunnel and underground diaphragm wall under division excavation of foundation pit are analyzed based on site monitoring data. The study results show that: (1) The maximum horizontal displacement of underground diaphragm wall is reduced by 23.9% and the maximum vertical displacement of the rivercrossing tunnel is reduced by 35.4% by adopting division excavation for foundation pit; and the protection effect of division excavation of foundation pit on tunnel closed to the foundation pit is better than that away from foundation pit. (2) The deformation of underground diaphragm wall increases with the growth of division area of foundation pit. (3) Oblique irregular deformation of rivercrossing tunnel occurs during foundation pit construction, and the deformation of the adjacent rivercrossing tunnel can be predicted based on the maximum horizontal displacement of underground diaphragm wall.
ZHANG Zhiguo , XI Xiaoguang , WU Ling . Numerical Simulation and Site Monitoring Analysis of Influence of Division Excavation of Foundation Pit on Adjacent Largediameter Rivercrossing Tunnel[J]. Tunnel Construction, 2018 , 38(9) : 1480 -1488 . DOI: 10.3973/j.issn.2096-4498.2018.09.010
/
| 〈 |
|
〉 |