Risk Analysis and Countermeasures for Excavation of Deep Foundation Pit in Waterrich Composite Strata
Received date: 2017-09-08
Revised date: 2018-08-28
Online published: 2018-09-30
The construction risk of deep metro foundation pit in waterrich composite strata is high, and there is little relevant research. Hence, the characteristics and risk of excavation of deep metro foundation pit in waterrich composite strata are summarized based on risk source analysis and construction experience of Guangzhou Metro; and the construction method of "excavation and assessment, presealing, defect repairing, scientific dewatering, uniform and adequate backfilling, accurate measurement, timely support and rapid construction" is proposed and introduced. The abovementioned method emphasizes the integrality and waterproofing capacity of the retaining structure, richwater risk and successful completion of highrisky construction procedure. The method takes the risk assessment as the basis and the countermeasure preposition as the core, by doing which the risk of deep foundation pit construction in waterrich composite strata can be effectively controlled.
ZHU Yuhong , CHEN Juwu , MA Hui , ZHAI Lihua . Risk Analysis and Countermeasures for Excavation of Deep Foundation Pit in Waterrich Composite Strata[J]. Tunnel Construction, 2018 , 38(9) : 1538 -1545 . DOI: 10.3973/j.issn.2096-4498.2018.09.017
/
| 〈 |
|
〉 |