Study and Application of Raiseboring Method for Deep Vertical Shaft of Railway Tunnel Construction:A Case Study of Dangjinshan Tunnel
Received date: 2017-10-24
Revised date: 2018-06-13
Online published: 2018-09-30
In order to meet the requirements of ventilation during construction and disaster prevention and rescue during operation of extralong railway tunnel, built spatial ventilation mode, rapid tunnel construction speed and avoid safety and environmental problems caused by drilling and blasting method, the characteristics of construction of vertical shaft of Dangjinshan Tunnel on DunhuangGolmud Railway are analyzed, schemes are compared and selected, and the raiseboring method for vertical shaft No. 2 is optimized based on its geological conditions. The results show that: (1) A deep vertical shaft with diameter of 3.0 m and depth of 442 m is successfully completed by using pneumatic DTH, BMC 600 raiseboring machine and KXP2D(S) digital compass inclinometer respectively in pilot hole drilling, hole enlarging and tilt angle measuring. (2) The deviation rate of the shaft is successfully controlled at 0.8% by rationally controlling drilling parameters; and the rapid and safe shaft construction with good quality has been guaranteed. (3) The onetime shaft completion by raiseboring method is feasible for railway tunnel vertical shaft; and its high mechanization level shows its superiority and progressiveness.
CHENG Shouye . Study and Application of Raiseboring Method for Deep Vertical Shaft of Railway Tunnel Construction:A Case Study of Dangjinshan Tunnel[J]. Tunnel Construction, 2018 , 38(9) : 1560 -1565 . DOI: 10.3973/j.issn.2096-4498.2018.09.020
/
| 〈 |
|
〉 |