ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Application of Separate Launching Technology of Doubleshield TBM to Qingdao Metro Line No. 1
Received date: 2018-01-08
Revised date: 2018-03-21
Online published: 2018-09-30
Due to the limited space of TBM launching area of Haiboqiao Station on Qingdao Metro Line No. 1, the separate launching technology of doubleshield TBM is adopted to realize construction function. The backup system is improved to realize separate launching of TBM with the lowest cost; and the basic separate launching scheme is discussed. The analytical results show that: (1) The basic backup systems needed for separate launching of doubleshield TBM include high/low voltage power supply and control system, water cooling system, hydraulic system, lubrication system, grease sealing system, air compression system, back filling and grouting system. (2) By lengthening the pipelines and cables, the doubleshield TBM can be disconnected at any position between the main body and the backup system or between the main body and part of backup system.
WANG Xiaoqiang , GUO Zhi , WANG Yidong , LI Changda , HAN Lisen , XU Chaoqun . Application of Separate Launching Technology of Doubleshield TBM to Qingdao Metro Line No. 1[J]. Tunnel Construction, 2018 , 38(9) : 1573 -1578 . DOI: 10.3973/j.issn.2096-4498.2018.09.022
/
| 〈 |
|
〉 |