Application of Outerhole Delay Detonating Circuit to Blasting Construction of Tunnel Laterally Crossing Dangerous Building
Received date: 2018-03-14
Revised date: 2018-04-23
Online published: 2018-10-26
The separated detonation of singlehole singlesection blasting should be carried out due to the limit of number of detonators. Hence, a new detonation circuit is proposed for the blasting excavation of tunnel laterally crossing dangerous building, i.e. using 20 sections of common detonator to carry out outerhole delay detonating between different detonation circuits and 3 sections of common detonators to carry out outerhole delay detonating in each detonation circuit. The field testing results show that by adopting the new detonation circuit: (1) the detonating time is reduced by 3 (from 5 to 2); (2) vibration peak of the new detonation circuit is almost as the same as that of original one; (3) the average vibration peak increases by 5%; and (4) no vibration superposition is identified.
YIN Wengang , WANG Hailiang , ZHANG Zuyuan , ZHANG Fuqiang . Application of Outerhole Delay Detonating Circuit to Blasting Construction of Tunnel Laterally Crossing Dangerous Building[J]. Tunnel Construction, 2018 , 38(10) : 1723 -1728 . DOI: 10.3973/j.issn.2096-4498.2018.10.017
/
| 〈 |
|
〉 |