Key Technologies for Investigation, Design and Treatment of Submarine Karst Shield Tunnel: a Case Study of Railway StationSuoyu Station Submarine Tunnel on Dalian Metro Line 5

  • ZHOU Huagui ,
  • HE Yitao
Expand
  • (1. China Railway Liuyuan Group Co., Ltd., Tianjin 300308, China; 2. CCCC Rail Transit Consultants Co., Ltd., Wuhan 430056, Hubei, China)

Received date: 2018-04-12

  Revised date: 2018-08-09

  Online published: 2018-12-02

Abstract

The exploration and design of tunnel in the submarine karst area are difficult and the construction risk is high. Hence, the crosshole CT geophysical prospecting + drilling method is adopted for the first time in largediameter submarine karst shield tunnel on Dalian Metro Line 5. And then the reinforcement range of the tunnel is determined by finite element method; the reinforcement standard of karst tunnel foundation is determined by antifloating calculation; and a specific implementation scheme of submarine karst pretreatment and the specific design scheme of shield construction are put forward. In this way, a whole set of exploration, design and treatment scheme of submarine karst shield tunnel is formed.

Cite this article

ZHOU Huagui , HE Yitao . Key Technologies for Investigation, Design and Treatment of Submarine Karst Shield Tunnel: a Case Study of Railway StationSuoyu Station Submarine Tunnel on Dalian Metro Line 5[J]. Tunnel Construction, 2018 , 38(11) : 1830 -1835 . DOI: 10.3973/j.issn.2096-4498.2018.11.011