Research on Pitch Adjustment Ability of Thrust System of Shield Used in Inclined Shaft
Received date: 2018-05-14
Revised date: 2018-07-20
Online published: 2019-01-03
In order to reduce the subjectivity and uncertainty of pitch adjustment of thrust system of shield boring in inclined shaft, the settlement description of shield pitch is proposed based on foundation settlement, and the settlement description model of shield pitch in inclined shaft is established based on Winkler elastic foundation model. And then, the mathematical model for describing pitch adjustment ability of propulsion system of shield in inclined shaft is established considering the load effect, and the calculation conditions of upper and lower limit values are given. Finally, the influence of design slope angle on pitch adjustment ability of thrust system of shield is studied based on the abovementioned mathematical model, by taking the inclined shaft project of Taigemiao Coal Mine in Xinjie, Inner Mongolia for example. The study results show that: (1) With the increase of downslope angle, the upper and lower limit values of pitch adjusting ability of shield thrust system decrease continuously. (2) When the downslope angle continuously increases, the rapid growth of sliding force would induce the continuous decrease of pitch adjustment ability of shield thrust system.
Key words: inclined shaft; shield thrust system; shield pitch; settlement; design slope angle
GUAN Huisheng , CHEN Ming , MI Shipeng , JIANG Yongchun , XIE Youhui . Research on Pitch Adjustment Ability of Thrust System of Shield Used in Inclined Shaft[J]. Tunnel Construction, 2018 , 38(12) : 2046 -2051 . DOI: 10.3973/j.issn.2096-4498.2018.12.018
/
| 〈 |
|
〉 |