Analytical Design Method for Yielding Pipe Length of Yielding Bolt

  • WU Fubao ,
  • WANG Zipeng ,
  • XIA Caichu ,
  • DENG Yungang ,
  • LIU Yupeng
Expand
  • (1 China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, Hubei, China;  2 Department of Geotechnical Engineering, College of Civil Engineering, Tongji University,  Shanghai 200092, China)

Received date: 2018-07-09

  Revised date: 2018-08-09

  Online published: 2019-02-01

Abstract

A favorable yielding performance of yielding bolt in soft rock tunnel with high ground stress and the stability of surrounding rock when release its deformation energy should be guaranteed As a result, an analytical design method for yielding pipe length of yielding bolt is proposed Based on the neutral point theory of bolt, the yielding effect of yielding bolt is taken into consideration in analysis of the interaction between surrounding rock and the bolt; the relative tensile deformation caused by yielding deformation along the tunnel radius is supposed to be coincide with the hyperbolic curve rule is assumed; and the calculation formula of internal forces of full length yielding bolt is deduced by establishing the equilibrium equation of axial tension on the two sides of bolt neutral point The axial force distribution of yielding bolt and its performance with the variation of yielding pipe length are obtained by application to Wanxichong Tunnel on KunmingYiliang Highway, and it is described as follow: the maximum axial force of the bolt decreases with the increase of yielding pipe length, while the distribution pattern of the axial force changes little Based on the abovementioned results, the design criteria for yielding pipe length is drawn as follows: (1) The lower limit of yielding pipe length is determined by the ultimate tensile force of yielding bolt to ensure that the bolt is not damaged due to pulloff (2) The upper limit of yielding pipe length is determined by adhesive frictional resistance acting on bolt at the wall of tunnel to guarantee the bolt neutral point theory established

Cite this article

WU Fubao , WANG Zipeng , XIA Caichu , DENG Yungang , LIU Yupeng . Analytical Design Method for Yielding Pipe Length of Yielding Bolt[J]. Tunnel Construction, 2019 , 39(1) : 119 -124 . DOI: 10.3973/j.issn.2096-4498.2019.01.015

Outlines

/

〈 〉