ISSN 2096-4498

   CN 44-1745/U

二维码

Analysis of Construction Organization Scheme of Fivebench Fourteenstep Excavation Applied to Gongbei Tunnel

  • XIONG Haoxiang ,
  • REN Hui ,
  • WENG Yuanlin
Expand
  • (1. ShenZhong Link Administration Center, Zhongshan 528400, Guangdong, China; 2. Management Centre,  Zhuhai Link of Hong KongZhuhaiMacao Bridge, Zhuhai 519060, Guangdong, China; 3. CRCC Harbour & Channel Engineering Bureau Group Survey & Design Institute Co., Ltd., Guangzhou 510000, Guangdong, China)

Received date: 2018-06-21

  Revised date: 2018-08-04

  Online published: 2019-03-05

Abstract

The 255 mlong mined section of Gongbei Tunnel of Hong KongZhuhaiMacao Bridge, crosses waterrich weak stratum and sensitive area of Gongbei Port, is constructed by curved pipe roof + freezing method and fivebench and fourteenstep excavation method. In order to guarantee the smooth construction organization and construction safety, the detail of fivebench and fourteenstep excavation method is introduced from the perspective of site management; the feasibility of the scheme is verified by field construction; and the existing problems, such as crosssection division of some benches, construction sequence arrangement of pilot tunnel, working face arrangement, etc., are put forward. Finally, the idea of excavation scheme and construction organization optimization and the comparison and selection scheme of adding ramp are proposed, and the monitoring results show that: The construction organization adjustment and optimization are feasible, which can ensure the smooth completion of Gongbei Tunnel on schedule.

Cite this article

XIONG Haoxiang , REN Hui , WENG Yuanlin . Analysis of Construction Organization Scheme of Fivebench Fourteenstep Excavation Applied to Gongbei Tunnel[J]. Tunnel Construction, 2019 , 39(2) : 281 -286 . DOI: 10.3973/j.issn.2096-4498.2019.02.014

Outlines

/

〈 〉