ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Boring Attitude Control Technology for Shallowcovered and Smallspacing Rectangular Pipe Jacking
Received date: 2018-06-29
Revised date: 2019-01-02
Online published: 2019-04-03
During the construction of smallspacing rectangular pipe jacking in an underground parking lot constructed by cut and convert (CC)method, problems such as the pipejacking machine declination and difficulty in controlling the jacking attitude often occur. Therefore, the causes for jacking declination and attitude deviation are theoretically analyzed based on attitude monitoring data, and corresponding control measures and field test are carried out. The results show that: (1) The causes for declination include machine body weight deviation, slurry leakage, insufficient attitude reservation and unstable backrest. (2) The declination can be effectively prevented by adopting measures such as equipment and pipe segment positioning, door sealing treatment, initial attitude reservation increasing and backrest stability control. (3) The door reservation and cutting during launching phase and boring speed control and Eshaped guide groove for axis control during jacking phase can effectively control the jacking attitude. (4) By adjusting the stroke difference of the articulated cylinder and the main push cylinder and the earth pressure along the direction of the attitude deviation, good effect has been achieved.
HU Jingjun , DOU Xiaotian , LI Zhijun , WANG Jinbo , ZHAO Liyong , LI Yongqiang . Boring Attitude Control Technology for Shallowcovered and Smallspacing Rectangular Pipe Jacking[J]. Tunnel Construction, 2019 , 39(3) : 465 -472 . DOI: 10.3973/j.issn.2096-4498.2019.03.018
/
| 〈 |
|
〉 |