Laws of Building Settlement Caused by Single Shield TBM Tunnel Construction in Composite Ground
Received date: 2018-08-07
Revised date: 2018-11-19
Online published: 2019-05-01
During TBM boring under buildings in shallowburied composite strata, pea gravel filling and grouting and the interface location of soft and hard rock both have great influence on building settlement. In order to find out those influence laws, numerical simulation and field monitoring methods are used. The following conclusions can be drawn: (1) After excavation and before pea gravel filling completed, the settlement of buildings, accounting for about 70% of the total settlement, is the fastest since the surrounding rock is in nonsupport state; (2) With the strong compressibility of pea gravels, settlement still existis when the pea gravel filling is finished, which accounts for about 30% of the total settlement; (3) The interface location of soft and hard rocks has significant influence on building settlement during tunneling of single shield TBM. According to the extent of influence, it can be classified into three categories and then control measures are given correspondingly. Both onsite monitoring and date analysis show that surface grouting and timely pea gravel filling and grouting are of great importance for settlement controlling of building.
LIU Yunjun , LI Huayun , HUANG Dan . Laws of Building Settlement Caused by Single Shield TBM Tunnel Construction in Composite Ground[J]. Tunnel Construction, 2019 , 39(4) : 594 -600 . DOI: 10.3973/j.issn.2096-4498.2019.04.009
/
| 〈 |
|
〉 |