ISSN 2096-4498

   CN 44-1745/U

二维码

Construction Technology and Countermeasures for TBM Boring in Broken Ground of Gaoligongshan Tunnel

  • ZHANG Bing ,
  • YANG Yandong ,
  • SUN Zhenchuan ,
  • MA Liang
Expand
  • (1. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China; 2. China Railway Tunnel Group Co., Ltd., Guangzhou 511458, Guangdong, China)

Received date: 2018-11-16

  Revised date: 2019-04-15

  Online published: 2020-03-11

Abstract

The broken ground at exit section of Gaoligongshan Tunnel on DaliRuili Railway has adverse effect on TBM construction. Hence, a series of mehods for TBM releasing in broken ground, i.e. chemical grouting reinforcement ahead of tunnel face, small guide hole excavation and advance piperoof, are proposed; and TBM equipment improvements such as extending the shield and increasing the limit plate on scraper mouth are proposed as well. And then, for the problem that the surrounding rock is prone to collapse after shield passing, some countermeasures including strengthening the primary support and chemical grouting of tunnel top, installing template and pouring cement slurry at the waist of tunnel, and mechanized slag clearing at the bottom of tunnel, are put forward. The field practice shows that by adopting the abovementioned methods, the risk of TBM being jammed in the broken ground is reduced effectively, and the cutterhead releasing time is reduced, which improves the TBM boring efficiency in broken ground.

Cite this article

ZHANG Bing , YANG Yandong , SUN Zhenchuan , MA Liang . Construction Technology and Countermeasures for TBM Boring in Broken Ground of Gaoligongshan Tunnel[J]. Tunnel Construction, 2019 , 39(5) : 851 -857 . DOI: 10.3973/j.issn.2096-4498.2019.05.017

Outlines

/

〈 〉