ISSN 2096-4498

   CN 44-1745/U

二维码

Construction Risks and Countermeasures for Largediameter Slurry Shield Used in Shiziyang Tunnel on FoshanDongguan Intercity Railway

  • WANG Yan
Expand
  • (China Railway Guangzhou Group Co., Ltd., Guangzhou 510060, Guangdong, China)

Received date: 2019-03-19

  Revised date: 2019-05-31

  Online published: 2019-07-02

Abstract

The cost and risk increase with shield diameter increase. Based on Shiziyang Tunnel on FoshanDongguan Intercity Railway, the risks existed in equipment type selection, longdistance deadend tunneling, uppersoft lowerhard strata and fault and fracture zone during largediameter slurry shield boring in complex strata with high water pressure and strong permeability are analyzed. The equipment adaptability is improved from the selection of atmospheric pressure cutterhead and slurry circulation system; the excavation parameter control method for excavation management and slurry management is determined; and construction countermeasures for uppersoft lowerhard strata and fault fracture zones are proposed to avoid significant geological risks and ensure construction safety of underwater largediameter shield.

Cite this article

WANG Yan . Construction Risks and Countermeasures for Largediameter Slurry Shield Used in Shiziyang Tunnel on FoshanDongguan Intercity Railway[J]. Tunnel Construction, 2019 , 39(6) : 983 -988 . DOI: 10.3973/j.issn.2096-4498.2019.06.011

Outlines

/

〈 〉