ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Development and Application of Key Technologies for TBM Used in Complex Geological Conditions
Received date: 2018-10-16
Revised date: 2019-03-07
Online published: 2019-07-02
When TBM boring in the unfavorable geology at the exit section of Gaoligongshan Tunnel, some incidents such as soft rock convergenceinduced TBM jamming, broken rock collapse, rockburstinduced spalling, high temperature damage and mud and water gushing happen, which indicates bad TBM adaptability. Therefore, some key technical solutions, i.e. variable section and lift type excavation technology, water body and rock mass integration advance prediction technology, concealed and normalized advanced drilling technology, frontmounted and automated concrete jet technology, enhanced and largescale primary support technology, forced cooling ventilation system, cutterhead and cutter optimization design technology, and rapid material transportation technology, are proposed and applied. And then, a domestic TBM with the maximum diameter of 9.03 m is jointly developed and tested in site. According to the problems encountered in site test, some TBM technical solutions are optimized and improved, and the application effect show that the drill footage per month reached more than 400 m in the early application stage.
YANG Yandong , CHEN Kui , ZHANG Xiao . Development and Application of Key Technologies for TBM Used in Complex Geological Conditions[J]. Tunnel Construction, 2019 , 39(6) : 1052 -1058 . DOI: 10.3973/j.issn.2096-4498.2019.06.020
/
| 〈 |
|
〉 |