ISSN 2096-4498

   CN 44-1745/U

二维码

Discussion on Clearance Area of 400 km/h Highspeed Railway  Tunnel Based on Rail Vehicle Internal Transient Pressure

  • SHI Xianming ,
  • WU Jian ,
  • WAN Xiaoyan ,
  • CHEN Yanghong
Expand
  • (1. China Railway Southwest Research Institute Co., Ltd., Chengdu 611731, Sichuan, China;  2. China Academy of Railway Sciences Corporation Limited, Beijing 100081, China)

Received date: 2018-12-03

  Revised date: 2019-04-23

  Online published: 2019-07-31

Abstract

The research on structural design parameters of 400 km/h highspeed railway tunnel is being carried out in order to promote the technical standards of highspeed railway tunnels in China, and in which the tunnel clearance area is one of the key items. The method for determining the clearance area of highspeed railway tunnel on the basis of passenger ear comfort standard is established from the aspect of rail vehicle internal transient pressure. Based on the control condition, the probability for maintaining existing tunnel clearance area is discussed in terms of rail vehicle airtightness by calculation and analysis. And the suggested clearance area of 400 km/h tunnel is proposed. The conclusions are drawn as follows: (1) The lowest train dynamic airtightness index is 22 s when the existing 350 km/h singleline tunnel operates at a speed of 400 km/h, and the rail vehicle internal transient pressure exceeds the passenger ear comfort standard may be a high probability event. (2) The suggested clearance areas of singleline and doubleline 400 km/h tunnels are 85 m2 and 100 m2 respectively, and the corresponding train dynamic seal index is 18 s, which is more reasonable to the existing train and therefor the risk of exceeding standard can be greatly reduced. (3) The suggested clearance area for 400 km/h highspeed railway tunnels and corresponding airtightness requirements can be taken as the reference for relevant standards and specifications.

Cite this article

SHI Xianming , WU Jian , WAN Xiaoyan , CHEN Yanghong . Discussion on Clearance Area of 400 km/h Highspeed Railway  Tunnel Based on Rail Vehicle Internal Transient Pressure[J]. Tunnel Construction, 2019 , 39(7) : 1118 -1124 . DOI: 10.3973/j.issn.2096-4498.2019.07.007

Outlines

/

〈 〉