ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Innovative Design and Application of Caiyun TBM to Gaoligongshan Railway Tunnel
Received date: 2019-01-25
Revised date: 2019-04-22
Online published: 2019-07-31
Gaoligongshan Tunnel, as a key control project of DaliRuili Railway, is characterized by three highs and four actives. During TBM construction, disasters such as fault fracture zone, mud gushing, rock burst, etc., would be encountered. As a result, the variable crosssection lifting excavation method is adopted for the main tunnel TBM design; and as well, some innovative technologies, i.e. preautomatic concrete spraying, concealed and normalized advance drilling and waterrock integration advance prediction, are used. The construction practice shows that the innovative designs of TBM have played a significant role in the excavation process and can provide reference for the design and application of TBM to similar geological conditions in the future.
XIE Chengtao , ZHAO Hailei . Innovative Design and Application of Caiyun TBM to Gaoligongshan Railway Tunnel[J]. Tunnel Construction, 2019 , 39(7) : 1201 -1208 . DOI: 10.3973/j.issn.2096-4498.2019.07.018
/
| 〈 |
|
〉 |