Innovative Design and Application of Caiyun TBM to Gaoligongshan Railway Tunnel

  • XIE Chengtao ,
  • ZHAO Hailei
Expand
  • (1. China Railway Tunnel Group Co., Ltd., Guangzhou 510000, Guangdong, China; 2. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China)

Received date: 2019-01-25

  Revised date: 2019-04-22

  Online published: 2019-07-31

Abstract

Gaoligongshan Tunnel, as a key control project of DaliRuili Railway, is characterized by three highs and four actives. During TBM construction, disasters such as fault fracture zone, mud gushing, rock burst, etc., would be encountered. As a result, the variable crosssection lifting excavation method is adopted for the main tunnel TBM design; and as well, some innovative technologies, i.e. preautomatic concrete spraying, concealed and normalized advance drilling and waterrock integration advance prediction, are used. The construction practice shows that the innovative designs of TBM have played a significant role in the excavation process and can provide reference for the design and application of TBM to similar geological conditions in the future.

Cite this article

XIE Chengtao , ZHAO Hailei . Innovative Design and Application of Caiyun TBM to Gaoligongshan Railway Tunnel[J]. Tunnel Construction, 2019 , 39(7) : 1201 -1208 . DOI: 10.3973/j.issn.2096-4498.2019.07.018

Outlines

/

〈 〉