ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Overall Design Scheme for Zheduoshan Tunnel in Both Longterm and Shortterm Perspectives
Received date: 2019-03-29
Online published: 2019-09-12
The extralong tunnel is difficult to upgrade and transform. Hence, an joint construction plan in both longterm and shortterm is creatively presented for Zheduoshan Tunnel project. The construction schemes are compared and analyzed from the aspects of traffic volume prediction, construction cost, ventilation and escaperescue design, and a practical construction plan, i.e. the national Grade 2 road tunnel main tunnel is constructed and 2 sections of breakthrough parallel heading are set firstly, and then the main tunnel is taken as right tunnel of highspeed tunnel and the brokenthrough parallel heading is taken as left tunnel of highspeed tunnel, is put forward. The results show that the joint construction scheme can effectively reduce the construction cost and social consumption.
TANG Rui , XIANG Long , WANG Jun , TANG Xie . Overall Design Scheme for Zheduoshan Tunnel in Both Longterm and Shortterm Perspectives[J]. Tunnel Construction, 2019 , 39(S1) : 340 -345 . DOI: 10.3973/j.issn.2096-4498.2019.S1.046
/
| 〈 |
|
〉 |